Title: Motion 23-063, authorizing the County Executive to approve the FEMA Letter of Map Revision Application for the Smith Island Estuary Restoration Project
Attachments: 1. Motion 23-063, 2. Staff Report, 3. Overview and Concurrence Form - SIGNED, 4. Overview and Concurrence (Form 1), 5. Riverine Hydrology and Hydraulics Form 2, 6. Riverine Form Structures 3, 7. Corrected Effective Workmap 1, 8. Corrected Effective Workmap 2, 9. Corrected Effective Workmap 3, 10. Proposed Workmap 4, 11. Proposed Workmap 5, 12. Proposed Workmap 6, 13. Annotated FIRM 7, 14. Annotated FIRM 8, 15. Annotated FIRM 9, 16. Letter from Dave Stewart, 17. Phase 2 Record Drawings, 18. Geo Technical Engineering Report, 19. Union Slough Setback Levee, 20. Motion Assignment Slip

 

 

Executive/Council Action Form (ECAF)

 

 

ITEM TITLE:

Title

Motion 23-063, authorizing the County Executive to approve the FEMA Letter of Map Revision Application for the Smith Island Estuary Restoration Project

body

DEPARTMENT:  Conservation and Natural Resources

 

ORIGINATOR:  Aaron Kopp

 

EXECUTIVE RECOMMENDATION:  Approved by Lacey Harper 2/2/23

 

PURPOSE: Authorize the County Executive to sign FEMA Letter of Map Revision document #MT-2 Form 1 to request revision of a FEMA Flood Insurance Rate Map for Union Slough in the Snohomish River estuary.

 

BACKGROUND: The County is required to submit a Letter of Map Revision (LOMR) for the Smith Island Estuary Restoration Project to FEMA. NThe Project is within the 100-year floodplain in between Union Slough and the Snohomish River. The project area is regulated as Density Fringe per Snohomish County Code Chapter 30.65. Development in the density fringe is managed to a 1-foot cumulative rise standard (SCC 30.65.240). The project improvements required a localized revision to the 100-year floodplain base flood elevations. The modeling results show small increases in maximum water surface elevations under project conditions with a local increase of 1.04 feet at the location of the East Tidal Channel outlet near the north end of Smith Island.

 

FISCAL IMPLICATIONS:

EXPEND: FUND, AGY, ORG, ACTY, OBJ, AU

CURRENT YR

2ND YR

1ST 6 YRS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TOTAL

 

 

 

 

 

REVENUE: FUND, AGY, ORG, REV, SOURCE

CURRENT YR

2ND YR

1ST 6 YRS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TOTAL

 

 

 

 

DEPARTMENT FISCAL IMPACT NOTES:  No fiscal impact.

 

CONTRACT INFORMATION:

ORIGINAL

 

CONTRACT#

 

AMOUNT

 

AMENDMENT

 

CONTRACT#

 

AMOUNT

 

 

Contract Period

ORIGINAL

START

 

END

 

AMENDMENT

START

 

END

 

 

OTHER DEPARTMENTAL REVIEW/COMMENTS:  Reviewed/approved by Finance - Nathan Kennedy 2/2/23