Snohomish Logo
File #: 2024-0092    Version: 1
Type: Motion Status: Approved
File created: 1/19/2024 In control: General Legislative Session
On agenda: 2/28/2024 Final action: 2/28/2024
Title: Motion 24-040, authorizing approval of Professional Services Agreement EF24-001G with Walker Consultants Inc for Structural Engineering Services for Fairgrounds Grandstand
Attachments: 1. Motion 24-040, 2. Agreement - SIGNED, 3. Staff Report, 4. Certificate of Insurance, 5. Motion Assignment Slip

 

 

Executive/Council Action Form (ECAF)

 

 

ITEM TITLE:

Title

Motion 24-040, authorizing approval of Professional Services Agreement EF24-001G with Walker Consultants Inc for Structural Engineering Services for Fairgrounds Grandstand

body

DEPARTMENT:  Conservation & Natural Resources/Parks and Recreation

 

ORIGINATOR:  Connie Price/Thomas Hartzell

 

EXECUTIVE RECOMMENDATION:  Approved by Lacey Harper 1/22/24

 

PURPOSE: To authorize approval of Professional Services Agreement EF24-001G with Walker Consultant for Structural Engineering Services for the Fairgrounds Grandstand.

 

BACKGROUND: The Evergreen Speedway Grandstands are situated within the Evergreen State Fairgrounds in Monroe and were constructed around 1967. The building spans an approximate area of 30,000 square feet, encompassing a grade-level display and concessions area below bleachers. The grandstand roof, measuring approximately 15,500 square feet, covers the upper sections of the bleachers. The roof  is a simple shed configuration, sloping from East to West at an approximate 2.5:12 slope. The roof panels are comprised of 22-gauge metal roof panels, each 38.5” wide and 21’ long. The panels are fastened with gasketed screws to the top flutes of purlins, - spaced  approximately 5’-2”. The purlins also bear lights affixed at their ends and through the roof, In 2014, a comprehensive Roof Evaluation Report highlighted various issues with the roof's structure. Notably, the purlins, characterized by an S-shaped sectional profile, suffered from extensive rust accumulation, particularly at the lap joints situated over the metal girders. Inspection revealed the presence of water within the bottom flanges of select purlins, attributed to the purlins' design collecting condensation water due to an upturned edge. This trapped moisture traveled to the lap joints, leading to persistent rusting. Furthermore, water infiltration at the lap joints in the metal roof panels  also facilitated the accumulation of water on the purlins.

 

FISCAL IMPLICATIONS:

EXPEND: FUND, AGY, ORG, ACTY, OBJ, AU

CURRENT YR

2ND YR

1ST 6 YRS

FGY-FM-801-4101

$50,000

$28,500

$78,500

 

 

 

 

 

 

 

 

 

 

 

 

TOTAL

$50,000

$28,500

$78,500

 

 

REVENUE: FUND, AGY, ORG, REV, SOURCE

CURRENT YR

2ND YR

1ST 6 YRS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TOTAL

 

 

 

 

DEPARTMENT FISCAL IMPACT NOTES:  Click or tap here to enter text.

 

CONTRACT INFORMATION:

ORIGINAL

X

CONTRACT#

EF24-001G

AMOUNT

$78,500

AMENDMENT

 

CONTRACT#

 

AMOUNT

 

 

Contract Period

ORIGINAL

START

Date of Execution

END

2/28/2025

AMENDMENT

START

 

END

 

 

OTHER DEPARTMENTAL REVIEW/COMMENTS:  Reviewed/approved by Risk - Shelia Barker 1/19/24 and Finance - Nathan Kennedy 1/19/24