Executive/Council Action Form (ECAF)
ITEM TITLE:
Title
Authorizing the Executive to sign Change Order CO-42 to Bid PW-24-027SB for the Construction at the New Start Center of Everett with Marpac Construction LLC.
body
DEPARTMENT: Facilities and Fleet Management
ORIGINATOR: Lance Meinhod
EXECUTIVE RECOMMENDATION: Approved
PURPOSE: To obtain Executive approval of Change Order 42 to Marpac Construction.
BACKGROUND: The County and Marpac Construction entered into an agreement on December 18th, 2024, for the construction phase of the New Start Center of Everett. During inspections the city electrical inspector requested surge protection for the electrical devices in the resident rooms. The solution for main surge protection devices at the panels was far quicker and less expensive than changing every individual electrical outlet. The industrial dryer required a single 30 amp breaker that was not included in the bid documents. Accessible signs for the parking stalls are required. Once the industrial laundry equipment was installed, it as determined the drain pipe was blocked. The pipe has a horizontal connection point and could not be checked prior to the equipment installation. Four of the locksets have been changed to be compatible with the access controls system for the entire facility. These items were provided on a time and materials basis. The County is only paying for the actual time and materials used to complete these tasks as documented in the attached paperwork.
FISCAL IMPLICATIONS:
EXPEND: FUND, AGY, ORG, ACTY, OBJ, AU
CURRENT YR
2ND YR
1ST 6 YRS
002 5123116201
$32,406.00
TOTAL
$32,406.00
REVENUE: FUND, AGY, ORG, REV, SOURCE
CURRENT YR
2ND YR
1ST 6 YRS
TOTAL
DEPARTMENT FISCAL IMPACT NOTES: Click or tap here to enter text.
CONTRACT INFORMATION:
ORIGINAL
CONTRACT #
PW 24-027SB
AMOUNT
$4,040,000.00
AMENDMENT|1010|CONTRACT #
PW 24-027SB
AMOUNT
$12,354.58
AMENDMENT|1010|CONTRACT #
PW 24-027SB
AMOUNT
$71,578...