Legislation Details

File #: 2026-1012    Version: 1
Type: Executive Status: Executive Approved
File created: 4/15/2026 In control: Executive
On agenda: Final action:
Title: Authorizing the County Executive to sign Change Order CO-30 to Bid PW-24-028SB with Lincoln Construction, Inc. for the Construction at the New Start Center of Edmonds.
Attachments: 1. PW-24-028SB Certificate of Insurance Renewed, 2. PW-24-028SB Agreement, 3. PW24-028SB Tracking Log, 4. Motion 24-417, Amended, 5. PW-24-028SB Change Order 01, 6. PW-24-028SB Change Order 02, 7. PW-24-028SB Change Order 03, 8. PW-24-028SB Change Order 04, 9. PW-24-028SB Change Order 05, 10. PW-24-028SB Change Order 06, 11. PW-24-028SB Change Order 07, 12. PW-24-028SB Change Order 08, 13. PW-24-028SB Change Order 09, 14. PW-24-028SB Change Order 10, 15. PW-24-028SB Change Order 11, 16. PW-24-028SB Change Order 12, 17. PW-24-028SB Change Order 13, 18. PW-24-028SB Change Order 14, 19. PW-24-028SB Change Order 15, 20. PW-24-028SB Change Order 16, 21. PW-24-028SB Change Order 17, 22. PW-24-028SB Change Order 18, 23. PW-24-028SB Change Order 19, 24. PW-24-028SB Change Order 20, 25. PW-24-028SB Change Order 21, 26. PW-24-028SB Change Order 22, 27. PW-24-028SB Change Order 23, 28. PW-24-028SB Change Order 24, 29. PW-24-028SB Change Order 25, 30. PW-24-028SB Change Order 26, 31. PW-24-028SB Change Order 27, 32. PW-24-028SB Change Order 28, 33. PW-24-028SB Change Order 29, 34. PW-24-028SB Change Order 30 - Proposed
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.


Executive/Council Action Form (ECAF)


ITEM TITLE:
Title
Authorizing the County Executive to sign Change Order CO-30 to Bid PW-24-028SB with Lincoln Construction, Inc. for the Construction at the New Start Center of Edmonds.
body
DEPARTMENT: Facilities and Fleet

ORIGINATOR: Lance Meinhold

EXECUTIVE RECOMMENDATION: Approved

PURPOSE: To obtain Executive approval of Change Order 30 to Lincoln Construction, Inc.

BACKGROUND: The County and Lincoln Construction Inc. (LCi) entered into an agreement on December 19th, 2024, for the construction phase of the New Start Center of Edmonds. Conditions around the accessible showers had to be modified because of existing, undocumented utilities behind non-bearing walls and because the specified single mold units could not be maneuvered into place without extensive demolition. The initial cost of the change order proposal was negotiated down from $21,037 by finding methods of construction other than those proposed by the contractor. The South County Fire Marshal is requiring a Knox Power Box to be tied to the fire alarm system. The requirement was not identified prior to the final fire inspection for the project. The code has been checked and references the requirement to be at the option of the fire marshal. During the final plumbing inspection, the inspector identified numerous existing items to be replaced including bathtub overflows, hot water tank valves, and mixing valves. In the interest of time and costs, the plumber has made the changes tracking the time used and materials with the general contractor. The County is only being charged for the time and materials used for these items. Without these items the inspector will not grant a certificate of occupancy.

FISCAL IMPLICATIONS:
EXPEND: FUND, AGY, ORG, ACTY, OBJ, AU
CURRENT YR
2ND YR
1ST 6 YRS
002 5123116201
$25,762.00














TOTAL
$25,762.00




REVENUE: FUND, AGY, ORG, REV, SOURCE
CURRENT YR
2ND YR
1ST 6 YRS
















TOTAL




DEPARTMENT FISCAL...