Authorizing the Executive to sign Change Order CO-33 to Bid PW-24-027SB for the Construction at the New Start Center of Everett with Marpac Construction LLC.
body
DEPARTMENT: Facilities and Fleet Management
ORIGINATOR: Lance Meinhold
EXECUTIVE RECOMMENDATION: Approved
PURPOSE: To obtain Executive approval of Change Order 33 to Marpac Construction.
BACKGROUND: The County and Marpac Construction entered into an agreement on December 18th, 2024, for the construction phase of the New Start Center of Everett. The bid documents missed the specification for the replacement handwash sink. At the bid walk the contractor assumed the existing sink could be reused. It became apparent the sink could not be removed and reused during the course of construction. Rockwool was removed from the demising walls between the residential room during the moisture remediation process and after the bid was issued. The rockwool is required to provide the maintain the minimum level of fire-resistance rating protection between the residential units. The cost of this change has been negotiated down $4,984.
FISCAL IMPLICATIONS:
EXPEND: FUND, AGY, ORG, ACTY, OBJ, AU
CURRENT YR
2ND YR
1ST 6 YRS
002 5123116201
$68,858.00
TOTAL
$68,858.00
REVENUE: FUND, AGY, ORG, REV, SOURCE
CURRENT YR
2ND YR
1ST 6 YRS
TOTAL
DEPARTMENT FISCAL IMPACT NOTES: Click or tap here to enter text.
CONTRACT INFORMATION:
ORIGINAL
CONTRACT #
PW 24-027SB
AMOUNT
$4,040,000.00
AMENDMENT|1010|CONTRACT #
PW 24-027SB
AMOUNT
$12,354.58
AMENDMENT|1010|CONTRACT #
PW 24-027SB
AMOUNT
$71,578.14
AMENDMENT|1010|CONTRACT #
PW 24-027SB
AMOUNT
$7,040.92
AMENDMENT|1010|CONTRACT #
PW 24-027SB
AMOUNT
$16,843.95
AMENDMENT|1010|CONTRACT #
PW 24-027SB
AMOUNT
$200,329.05
AMENDMENT|1010|CONTRACT #
PW 24-027SB
AMOUNT
$143,596.21
AMENDMENT|1010|CONTRACT #
PW 24-027SB
AMOUNT
$106,047.50
AMENDMENT|1010|CONTRACT #
PW 24-027SB
AMOUNT
$53,78...