Legislation Details

File #: 2025-3352    Version: 1
Type: Executive Status: Executive Approved
File created: 10/15/2025 In control: Executive
On agenda: Final action:
Title: Authorizing the Executive to sign of Change Order CO-24 to Bid PW-24-027SB for the Construction at the New Start Center of Everett with Marpac Construction LLC.
Attachments: 1. PW-24-027SB Certificate of Insurance, 2. PW-24-027SB Agreement, 3. PW24-027SB Tracking Log, 4. Motion 24-417, Amended, 5. PW-24-027SB Change Order 01, 6. PW-24-027SB Change Order 02, 7. PW-24-027SB Change Order 03, 8. PW-24-027SB Change Order 04, 9. PW-24-027SB Change Order 05, 10. PW-24-027SB Change Order 06, 11. PW-24-027SB Change Order 07, 12. PW-24-027SB Change Order 08, 13. PW-24-027SB Change Order 09, 14. PW-24-027SB Change Order 10, 15. PW-24-027SB Change Order 11, 16. PW-24-027SB Change Order 12, 17. PW-24-027SB Change Order 13, 18. PW-24-027SB Change Order 14, 19. PW-24-027SB Change Order 15, 20. PW-24-027SB Change Order 16, 21. PW-24-027SB Change Order 17, 22. PW-24-027SB Change Order 18, 23. PW-24-027SB Change Order 19, 24. PW-24-027SB Change Order 20, 25. PW-24-027SB Change Order 21, 26. PW-24-027SB Change Order 22, 27. PW-24-027SB Change Order 23 - ECAF 2025-3284, 28. PW-24-027SB Change Order 24 - Proposed, 29. PW-24-027SB Change Order 24 - EXEC SIGNED
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.


Executive/Council Action Form (ECAF)


ITEM TITLE:
Title
Authorizing the Executive to sign of Change Order CO-24 to Bid PW-24-027SB for the Construction at the New Start Center of Everett with Marpac Construction LLC.
body
DEPARTMENT: Facilities and Fleet Management

ORIGINATOR: Lance Meinhold

EXECUTIVE RECOMMENDATION: Approved

PURPOSE: To obtain Executive approval of Change Order 24 to Marpac Construction.

BACKGROUND: The County and Marpac Construction entered into an agreement on December 18th, 2024, for the construction phase of the New Start Center of Everett. The City of Everett Electrical Inspector pointed to several typical conditions that would need to be repaired during a pre-construction meeting. These conditions were exposed by the moisture remediation process which occurred after the bid walk. Thus, the contractor had no previous knowledge of the condition to include the repairs in the base bid. The electricians tracked their time and materials to make the repairs as evidenced in the attached documents. The exterior, egress lights on the back building (Building B) were found to be wired directly to the electrical panel. The general contractor's initial suggestion was to install a time clock and rewire all of the exterior egress lights. The electrical engineer's solution to connect all of the exterior egress lights to a single switch within the electrical panels results in salvaging the existing wiring and saved approximately $25,000 in labor and materials. Tariffs on electrical components have increased the costs of the materials made after the bid and prior to purchasing by approximately 17%. The Electrical Inspector has found 94 electrical receptacles that are required to be circuited through a ground fault interceptor but are not. This work will correct those conditions. The south bearing wall of the laundry room was found to be largely rotten when the drywall was removed for the moisture remediation process after the bid walk. The change ...