Snohomish Logo
File #: 2023-0252    Version: 1
Type: Motion Status: Approved
File created: 3/8/2023 In control: Administrative Session
On agenda: 3/21/2023 Final action: 3/21/2023
Title: Motion 23-113, authorizing the County Executive to sign Professional Services Agreement CCF02-23 with TranTech Engineering, LLC to provide design services for the 132nd Street SE / 134th Place SE / Cathcart Way Overlay Project
Attachments: 1. Motion 23-113, 2. Staff Report, 3. Agreement - SIGNED, 4. Certificate of Insurance, 5. Motion Assignment Slip


Executive/Council Action Form (ECAF)


ITEM TITLE:
Title
Motion 23-113, authorizing the County Executive to sign Professional Services Agreement CCF02-23 with TranTech Engineering, LLC to provide design services for the 132nd Street SE / 134th Place SE / Cathcart Way Overlay Project
body
DEPARTMENT: Pubic Works

ORIGINATOR: Lori Ericsson

EXECUTIVE RECOMMENDATION: Approved by Ken Klein 3/9/23

PURPOSE: Approval of Agreement CCF02-23 will allow Snohomish County Public Works to utilize TranTech Engineering, LLC to provide Design Services necessary to complete the 132nd Street SE / 134th Place SE / Cathcart Way Overlay project.

BACKGROUND: The Department of Public Works (PW) has received federal funding to complete an Overlay Project at 132nd Street SE / 134th Place SE / Cathcart Way. 132nd Street SE / 134th Place SE / Cathcart Way has an average daily traffic count of approximately 11,000. In addition to an overlay the project will update existing ADA ramps to current ADA standards, replace existing lane and edge striping with methyl methacrylate (MMA) and install conduit at each signalized intersection to accommodate future APS equipment. The Engineering Services division of PW does not currently have the staff capacity to complete Design Services for this project. Through a Request for Qualifications (RFQ) PW has solicited the services of a consultant to assist the County with this project. TranTech Engineering, LLC. responded to RFQ-22-009SB and was selected through established Federal, State and County policies and practices. This agreement includes surveying, traffic engineering, and full PS&E for curb ramp design. A Professional Services Agreement between Snohomish County and TranTech Engineering, LLC. was negotiated. The total budget for this ECAF is $304,548.20, which includes the agreement amount of $276,862.00 and an additional 10% contingency amount of $27,686.20, for allowable unforeseen costs. The approving motion for the agreement authorizes...

Click here for full text